
Real projects, documented results.
Cross-border relocations, presses in the hundreds of tons, complete overhead crane systems. Every project here is backed by actual job-site photography of our crews at work.

A plant crossed the border: ABB Ramos Arizpe.
International relocation of complete stamping and machining lines, from Tennessee to Coahuila.
Read the project →
Glasgow, KY → Monclova: the electrical side of two Schuler presses.
Documented electrical disconnection of two Schuler presses (1,500 and 3,000 tons) in Kentucky and their reconnection in Monclova, Coahuila.
Read the project →
Carrier: from Collierville, TN to Santa Catarina, N.L.
Cross-border transfer of two production lines, from teardown in the U.S. to electrical reconnection in Mexico.
Read the project →
The full life cycle of your overhead crane.
Installation, relocation, runway alignment and maintenance of overhead cranes for plants across northern Mexico.
Read the project →
180-ton molding machine set in 3 days: Phillips Apodaca.
Container unloading, rigging and installation of a 180-ton injection molding machine in three days.
Read the project →Tell us about the job.
We come back with a clear quote and a plan built around your scheduled shutdown.
Request a quote →